guides:commission-site
Table of Contents
Commission a Site
Commissioning activates a mapped Source, Factory or Settlement with its initial cargo delivery. Until that delivery is complete, the Live Map and radio menu show the commissioning requirement instead of ordinary operating stock.
- Select the mapped but inactive site on the Live Map and note its required cargo.
- Find a Source or Factory that can provide that cargo and choose an aircraft that can carry it.
- Stage and load the crate, then navigate to the inactive site.
- Deliver with
Cargo > Deliverwith the aircraft at the marked construction point, exactly as for a normal cargo delivery. - If more than one crate is required, recheck the remaining requirement before the next flight.
Success. A commissioned Source starts producing after its final crate arrives. A commissioned Factory begins accepting recipe inputs. A commissioned Hub or City begins consuming Food, gains level 1 and can hold non-Food Reserve cargo.
The tyre at the construction point turns into a helipad two minutes after the final delivery. Take off and clear the spot before then: the helipad appears exactly where the tyre lies.
Commissioning cargo is delivered normally and is not paid from a Settlement Reserve.
Components Used
Related Guides
guides/commission-site.txt · Last modified: by 127.0.0.1
